Close Menu
Nicaragua Times
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Nicaragua Times
    subscribe
    • Breaking News
    • Business & Economy
    • Crime & Public Safety
    • Culture & Lifestyle
    • Politics
    • Sports
    Nicaragua Times
    Breaking News

    Artemis rocket heads back to its hangar for repairs as moonshot put on hold

    Artemis rocket heads back to its hangar for repairs as moonshot put on hold
    Share
    Facebook Twitter LinkedIn Pinterest Email

    NASA on Wednesday is set to roll its enormous Space Launch System rocket back to the hangar for repairs, a move that will delay the launch of four astronauts on a long-awaited flight around the moon by at least a month.

    The 322-foot-tall rocket has been sitting out at the launch pad at Florida’s Kennedy Space Center since mid-January, but engineers recently found a blockage in the flow of helium to part of the booster’s upper stage that requires further investigation.

    The rollback means NASA will no longer be able to attempt to launch the Artemis II mission in March. Agency officials said they could potentially try in April, but the timeline will depend on the outcome of the repairs.

    “I understand people are disappointed by this development,” NASA Administrator Jared Isaacman wrote Saturday in a post on X. “That disappointment is felt most by the team at NASA, who have been working tirelessly to prepare for this great endeavor.”

    Rolling the rocket back to its hangar is a major undertaking. The 4-mile journey, which is set to begin Wednesday morning at around 9 a.m. ET, is a famously slow one, and is expected to take up to 12 hours to complete. The 11-million-pound rocket, stacked with the Orion capsule on top, will be carried on a moving platform known as a crawler-transporter that will move at a snail’s pace of around 1 mile per hour.

    Once the rocket reaches the hangar, called the Vehicle Assembly Building, NASA said teams will install platforms that will allow engineers to reach where the helium flow issues were detected.

    The agency said batteries in the rocket’s upper stage and in a safety mechanism known as the flight termination system will also be replaced and tested while the booster is in the Vehicle Assembly Building.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Democrats sound alarm on VA policy that could reduce medical benefits for veterans

    February 25, 2026

    CBS News: The State of the Union Address

    February 25, 2026

    Fact-checking Trump’s State of the Union address

    February 25, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Recent News

    Cubans Who See Staying in Nicaragua as a Viable Option

    February 25, 2026

    Autoridades de EE. UU. capturan a nicaragüenses por robos en varios estados

    February 25, 2026

    «La dictadura está en sus días finales» en Nicaragua

    February 25, 2026

    Democrats sound alarm on VA policy that could reduce medical benefits for veterans

    February 25, 2026

    Aprueban financiamiento para el proyecto vial Carretera a Masaya–Sabana Grande

    February 25, 2026

    Un Ortega errático alaba a Rosario Murillo mientras ataca a EEUU

    February 25, 2026
    About
    About

    Nicaragua Times is an independent digital news aggregation and publishing platform that delivers timely and relevant news to a global audience.

    Facebook X (Twitter) Instagram Pinterest YouTube

    Cubans Who See Staying in Nicaragua as a Viable Option

    February 25, 2026

    Autoridades de EE. UU. capturan a nicaragüenses por robos en varios estados

    February 25, 2026

    «La dictadura está en sus días finales» en Nicaragua

    February 25, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    © 2026 Nicaragua Times
    • Home
    • About Us
    • Contact Us
    • Disclaimer
    • Privacy Policy
    • Terms and Conditions

    Type above and press Enter to search. Press Esc to cancel.